1000 Housing Unit at Mihindusenapura, Dematagoda – Phase 01 – 320 Housing Units
The Ministry of Special Project under the Ministry of Finance originally implemented this project. The project was assigned to us by a special Cabinet paper to redesigned and implement the project. A design and build project was turned in to a measure and pay method project with major changes to the design and the construction method. Which included mechanical, electrical, plumbing, drainage, electrical distribution system and generators. A Malaysian based slip formwork system used for fast track implementation.
The Ministry of Special Project under the Ministry of Finance originally implemented this project. The project was assigned to us by a special Cabinet paper to redesigned and implement the project. A design and build project was turned in to a measure and pay method project with major changes to the design and the construction method. Which included mechanical, electrical, plumbing, drainage, electrical distribution system and generators. A Malaysian based slip formwork system used for fast track implementation.